E-media: Al Madinah Al Munauwarah. A new electronic lighting was introduced by the general Administration of Maintenance and Operation Department of Madinah Municipality. This system uses GMC communication system between the lighting network and the supervision body at a cost of SR 18,565,850. According to the SPA, the new system aims at providing full remote control on the lighting network of the municipality, raising the quality of maintenance and saving time necessary for maintenance, saving electricity and reducing labor needed for maintenance. The new system also specifies where a damage occurred and its type then sends an SMS to the supervisor. A new wireless control system has been installed on lighting poles astronomical clock is used to conserve energy it switches light on and off accurately.
Last Modified Date: 10/02/2013 - 3:33 PM Saudi Arabia Time